Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf WeeklyThe Gulf Weekly
    • Home
    • UAE
    • KSA
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf WeeklyThe Gulf Weekly
    Home»Technology»DEWA sets new world record with 0.82 minutes annual power disruption

    DEWA sets new world record with 0.82 minutes annual power disruption

    Editorial TeamBy Editorial TeamApril 28, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    DUBAI, 28th April, 2026 (WAM) — Saeed Mohammed Al Tayer, MD and CEO of Dubai Electricity and Water Authority (DEWA), announced that DEWA has set a new world record for the lowest electricity customer minutes lost (CML), at just 0.82 minutes (about 49 seconds) per year.

    With this significant achievement, DEWA has surpassed its own previous world record of 0.94 minutes in 2024, representing an improvement of around 13%.

    “We utilise the latest technologies of the Fourth Industrial Revolution, particularly artificial intelligence, which we are fully integrating into DEWA’s strategies and operations,” Al Tayer said.

    He added that the smart grid is a fundamental pillar of DEWA’s strategy to deliver services according to the highest standards of availability, reliability and efficiency. This supports the Dubai 2040 Urban Master Plan and the Dubai Economic Agenda (D33), which seek to consolidate Dubai’s position among the top three global cities.

    Al Tayer explained that the Smart Grid, which DEWA is implementing with total investments of AED7 billion up to 2035, provides advanced features that enhance the efficiency of energy transmission and distribution, reduce outages, minimise losses, improve electrical load management and enhance the happiness of customers and all stakeholders.

    One of the key programmes is the Automatic Smart Grid Restoration System, the first of its kind in the Middle East and North Africa. The system enables remote, round-the-clock control, management and monitoring without human intervention, through innovative centralised systems that automatically locate and isolate faults and restore service, accelerating power restoration and increasing reliability.

    DEWA reduced CML in Dubai from 6.88 minutes per year in 2012 to just 0.82 minutes in 2025, significantly lower than the average of approximately 15 minutes recorded by leading utility companies in the European Union.

    Source: Emirates News Agency

    Related Posts

    Liplyn Academy Launches to Help MENA Organisations Thrive in the AI Search Economy

    July 29, 2026

    Samsung and Broadcom sign an AI chip deal

    July 29, 2026

    Ookla unveils trends in AI cloud latency

    July 29, 2026
    Don't Miss

    Liplyn Academy Launches to Help MENA Organisations Thrive in the AI Search Economy

    Technology July 29, 2026

    UAE-based AI search company Liplyn has launched Liplyn Academy, providing organizations across the Middle East…

    Ghana mourns its tallest man

    July 29, 2026

    RTA announces temporary staircase building at Dubai Mall Metro Station

    July 29, 2026

    Indian family in UAE struggles to raise over Dh10 million for son’s treatment

    July 29, 2026
    Our Picks

    Liplyn Academy Launches to Help MENA Organisations Thrive in the AI Search Economy

    July 29, 2026

    Ghana mourns its tallest man

    July 29, 2026

    RTA announces temporary staircase building at Dubai Mall Metro Station

    July 29, 2026

    Indian family in UAE struggles to raise over Dh10 million for son’s treatment

    July 29, 2026
    2026. All rights reserved.
    • UAE
    • KSA
    • GCC
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.